Home What we do Process Areas we cover About Questions Assurances Book a survey

Home  /  Questions

Questions

The things people
actually ask.

Straight answers, including the ones about cost, mess and what happens when something unexpected turns up behind a wall.

Free45-minute survey
1 dayTo a survey slot
12 moWorkmanship guarantee
£5mPublic liability cover

Before you start

Do you charge for a survey?

No. The first visit is free, takes about forty-five minutes, and there is no obligation at the end of it. We measure, photograph, check for moisture and examine the room properly before we tell you anything.

How soon can you come and look?

Usually within one working day of your enquiry. A written proposal follows within two working days of the visit.

Do I need to have decided everything first?

No, and most people have not. Bring whatever you have — a saved photograph, a tile you liked, or nothing at all. Part of what we do is turn a vague idea into a specification you can actually order from.

Do you work with architects or interior designers?

Yes. If you already have drawings we will build to them and flag anything that will not work in practice before it becomes a problem on site.

Time and disruption

How long does a bathroom take?

A refit in the existing layout is typically seven to ten working days. Moving a bath to a walk-in shower is ten to twelve. Wetrooms and loft bathrooms run to three or four weeks. You get named dates in the written proposal rather than a vague range.

Do we have to move out?

Almost never. Most clients stay put throughout. If it is your only bathroom we will tell you at survey exactly which days it is unusable, and where the layout allows we can often keep a WC in service for most of the job.

How much mess will there be?

Floors and stairs are protected, the route to the skip is agreed before day one, and all waste is removed by registered waste carriers. We clean at the end of each day rather than at the end of the job.

What are the working hours?

Normally eight to five, Monday to Friday. In mansion blocks and managed buildings the freeholder often sets tighter hours, and we build that into the programme at survey rather than discovering it in week one.

Will you need access to my neighbour's property?

Occasionally, where a shared stack or a party wall is involved. We will tell you at survey if it is likely, and we handle the conversation rather than leaving it to you.

Budget and payment

What sort of budgets do you work with?

Most of our work sits somewhere between £7,000 and £30,000 or more, and we take jobs right across that range. A refit in the existing layout with sensible choices sits at the lower end. Moving services, forming a wetroom, or specifying natural stone and bespoke joinery moves it up. Tell us your figure at survey and we will tell you honestly what your room can be done for, rather than quoting you for something you did not ask for.

Do you supply the tiles and sanitaryware, or do we?

Either. Most clients prefer us to specify and order, because it means one point of responsibility if something arrives damaged or short. If you would rather choose and buy yourself, that is fine — tell us early so we can check the pieces work with the layout before you commit.

What if we have already bought some of the materials?

Plenty of people have fallen for a tile or a bath before they call us. Bring it to the survey. We will build the specification around it and tell you honestly if anything will cause a problem, such as a tile that needs a wider grout joint or a bath that will not sit where you imagined.

How do you handle changes halfway through?

Changes are normal. We price them in writing before anything is done, so you always know what a decision costs before you make it. Nothing appears on a final invoice as a surprise.

Do you take a deposit?

We take payment in stages against work completed and materials ordered, never a large sum up front. It is the arrangement that protects you, and it is the reason most complaints about builders never happen to our clients.

Regulations and standards

Do I need building regulations approval?

Bathroom work usually involves notifiable electrical work, and may involve drainage, ventilation or structural changes. We tell you at survey exactly what is notifiable and we handle the notification.

Who certifies the electrical work?

A registered electrician, notified under Part P. The certificate comes to you on completion. You should receive a physical certificate through the post from the scheme, not just our word for it.

What ventilation is required?

Part F requires mechanical extract in a bathroom, and where there is no openable window it is mandatory. We fit humidity-sensing units with an overrun timer, ducted to outside air rather than into a loft void.

What about asbestos in an older property?

Artex, floor tiles and bath panels in pre-2000 properties can all contain asbestos. We stop and test rather than guess, and we will not break out material we are unsure about.

The build itself

What is tanking and why does it matter?

Tanking is a waterproof membrane applied to the walls and floor before tiling. Tile adhesive and grout are not waterproof. Without a membrane, water passes through to the substrate, and the failure shows up in the room below rather than in yours.

How do I know it has actually been done?

We photograph the tanked room before any tiling and send it to you. Once tiles are on, nobody can verify what is behind them — including you. If any contractor cannot show you that stage, ask them why.

What if you find something unexpected behind the walls?

It happens on most jobs. We photograph whatever we find and send it to you the same day, with what it means and what it would cost to put right. You decide. We do not carry on quietly and add it to the bill.

Can you keep our existing bath or basin?

Sometimes. If a piece is in good condition and can be removed without damage we will price to retain it. Be aware that older sanitaryware often does not line up with modern waste positions once walls are re-boarded.

Afterwards

What guarantee do we get?

Our workmanship is guaranteed for twelve months from handover. If something needs attention in that time we come back and put it right. Manufacturer warranties on sanitaryware and brassware run separately and are usually longer.

What happens at handover?

You walk the finished room with us and list anything you are not happy with. Nothing is signed off and nothing is closed until that list is dealt with.

Are you insured?

Yes, to £5m public liability. Ask for the certificate before we lift a floorboard and we will send it the same day.

What paperwork do we end up with?

The electrical certificate, any building control notification, manufacturer documentation for the products installed, and the photographs of the tanked room before tiling.

Not answered here? Ask us directly — we would rather have the conversation than have you guess.

Still have a question?

Call, message or send us a few words about your room. No call centre, no sales visit, no pressure.