Full bathroom refit
A complete renewal of the room in its existing layout. The fastest route to a bathroom that works, because nothing structural moves and no services are re-routed.
What decides it: the condition of what is behind the tiles. We will not know until the old room is out.
Typical programme: 7–10 working days
More on full bathroom refit
02
Walk-in showers
The most common change we make. Removing a bath and forming a walk-in enclosure gains usable space, but it moves waste and supply, and it puts far more water against the wall.
What decides it: where the waste can run, and whether the floor build-up allows a level tray.
Typical programme: 10–12 working days
More on walk-in showers
03
Wetrooms
No tray, no upstand, no threshold. A wetroom is the most demanding bathroom to build correctly and the least forgiving of shortcuts.
What decides it: the floor. A timber floor needs more work than concrete before anything is tanked.
Typical programme: 3–4 weeks
More on wetrooms
04
Ensuite bathrooms
Small rooms are harder, not easier. In an ensuite the setting out has to be right on paper before anything is ordered.
What decides it: setting out. In a small room the door swing and the basin position settle the whole layout.
Typical programme: 6–9 working days
More on ensuite bathrooms
05
Cloakrooms and WCs
Under stairs, on a half landing, or carved out of a hallway. Usually the cheapest way to add real value to a London house.
What decides it: the soil connection. How far the WC sits from the stack decides whether it is simple or not.
Typical programme: 4–6 working days
More on cloakrooms and WCs
06
Loft bathrooms
A loft bathroom is a plumbing and coordination job as much as a bathroom. Everything has to be brought to a floor that was never designed to have it.
What decides it: head height, waste runs and water pressure. All three get checked before we price it.
Typical programme: 3–5 weeks
More on loft bathrooms