Full bathroom refit
A complete renewal of the room in its existing layout. The fastest route to a bathroom that works, because nothing structural moves and no services are re-routed.
Typical programme: 7–10 working days
More on full bathroom refitHome / What we do
What we do
From a first pencil sketch to the last clean, we take care of the details that make a renovation feel easy.
A complete renewal of the room in its existing layout. The fastest route to a bathroom that works, because nothing structural moves and no services are re-routed.
Typical programme: 7–10 working days
More on full bathroom refitThe most common change we make. Removing a bath and forming a walk-in enclosure gains usable space, but it moves waste and supply, and it puts far more water against the wall.
Typical programme: 10–12 working days
More on walk-in showersNo tray, no upstand, no threshold. A wetroom is the most demanding bathroom to build correctly and the least forgiving of shortcuts.
Typical programme: 3–4 weeks
More on wetroomsSmall rooms are harder, not easier. In an ensuite the setting out has to be right on paper before anything is ordered.
Typical programme: 6–9 working days
More on ensuite bathroomsUnder stairs, on a half landing, or carved out of a hallway. Usually the cheapest way to add real value to a London house.
Typical programme: 4–6 working days
More on cloakrooms and wcsA loft bathroom is a plumbing and coordination job as much as a bathroom. Everything has to be brought to a floor that was never designed to have it.
Typical programme: 3–5 weeks
More on loft bathroomsA survey within one working day, and a written proposal within two. No sales visit, no pressure.